TOPOGRAPHIC SURVEY OF KUSAHA-BIRATNAGAR 132 KV TRANSMSISSION LINE
- Project Date:10 February 2020
- Our Team:
- Client:
- Categories:Substation/ Transmission Line
Description
NEA Engineering Company Limited (NEC) and Nepal Electricity Authority, Kusaha-Biratnagar 132 kV Transmission line project entered into the contract on 10th September 2019 for Detail topographic survey of Kusaha-Biratnagar 132 kV Double Circuit Transmission Line Project. The proposed transmission line connects 400/220/132 kV Inaruwa substation to 132 kV Biratnagar Substation via 23 km long 132 kV double circuit transmission line. This project lies entirely in the Sunsari and Morang Districts in province-1 of Nepal.
The major tasks associated with this project is to conduct drone survey and mapping of the transmission line alignment with high precision and prepared survey report including final benchmark and angle point fixation with maps and D-cards. Drone and DGPS were used for the survey works.
The total study duration of the project is 40 days.
The final draft report has been submitted to the client for approval.
All the project works have been completed subject to closing upon final approval from the client.