EIA Study of Phukot HEP
- Project Date:05 June 2018
- Our Team:
- Client:
- Categories:EIA Study
Description
PHUKOT KARNALI PEAKING RoR HYDROELECTRIC PROJECT (426 MW)
Commencement |
October 10,2017 |
Completion |
November 10 ,2019 |
Duration |
26 Months |
Quick View of the Project (Based on desk study)
Generals |
||
|
The Employer |
Vidhyut Utpadan Company Limited (VUCL) |
|
The Consultant |
NEA Engineering Company Limited |
|
Project Location |
Karnali Province, Kalikot District, Nepal |
|
|
Latitudes 29⁰19’03” N to 29⁰09’32” N |
|
|
Longitudes 81⁰45’00” E to 81⁰35’28” E |
|
|
Proposed Intake site: Approximately 35km upstream of the headworks area of Upper Karnali Hydroelectric Project (900 MW)
Proposed Power House site: Approximately 7 KM Upstream of the Karnali River and Tila River confluence. |
|
Accessibility |
Nearest all weather road is lies in Humla-Karnali Highway Near Manma Bazar, District Headquarter of kalika District Approximately 160 km north of Birendranagar Bazar(Surkhet Airport) in Surkhet District |
|
Access Road to Power House and Headworks Site |
No Access to PH and HW; PH area :About 1 hour walking distance from Manma Bazaar H/W Area: About 2 hour walking distance from Powerhouse Area |
Technical |
||
|
Project Type |
Peaking Run of River (PROR) |
|
Karnali River |
|
Stream flow gauging station |
Lalighat Gauging Station installed by DHM in the downstream of Proposed Dam site |
|
Catchment Area |
16,902 Km2 (Approx.) |
|
Design Discharge |
348 m3/s |
|
Water Conveyance System |
||
Type |
: Headrace tunnel, surge shaft /penstock pipe |
|
Gross Head |
: 180 m |
|
|
Powerhouse |
|
Type |
: Underground/ Surface |
|
Number of Generating Units |
: 3/4 |
|
Type of Turbine |
: Francis horizontal shaft |
|
Installed Capacity |
426 MW |
|
Power and Energy |
||
Power |
: 426 MW |
|
Total Annual Energy |
: 2510.02 GWh (Without outage) |
Consultant Scope of Works:
- Literature review of the previous study;
- Detailed Engineering study of KAHEP incorporating the technical, financial, Socio-economic and relevant aspects of the project development based on detailed survey and investigations.
- Preparation of Bid Documents in accordance with FIDIC Contract.