Modi Jalvidhyut Company Limited is implementing Upper Modi A Hydroelectric Project Upper Modi Hydroelectric Project as cascade schemes located in Kaski district, Gandaki Province. The contract was signed on 24th March 2022 for consulting services for the construction supervision of UMAHEP and UMHEP. NEC has served its expertise in the initial part of construction phase that includes preparation of bidding documents and review of other documents including updating the cost estimates. Following the commencement of the work by the Lot 1 Civil and Hydro-mechanical Contractor for UMAHEP, NEC has already mobilized the consulting engineers to the site. The technical bid evaluation of Lot 2: Electro-mechanical Works is ongoing. Similarly, the bidding process of Lot 1: Civil and Hydromechanical Works for UMHEP has been initiated.
Upper Modi A Hydroelectric Project
Upper Modi Hydroelectric Project
Objective of the Projects:
To harness the hydropower from Modi River in the run of the river type cascade scheme in the Kaski district of Gandaki Province and generate 60.2 MW electricity with the designed discharge of 17.4 m3/sec from Modi River upon completion of the project.
Contract:
Consulting services for Project Cost Updates for Civil, Hydro-mechanical, Electromechanical, Transmission Works, and construction supervision works of both cascade schemes.
Consulting project’s highlights
Project progress status till date
Status Ongoing
Tags: Construction Supervision