Objective of the Project:
The project aims to divert a perennial flow of 13.4 m³/s from the Rolwaling Khola into the Tamakoshi River to meet the Upper Tamakoshi Hydroelectric Project's design requirements during the lean period. This diversion is intended to sustain and enhance peaking power generation, while also facilitating a standalone generation capacity of 22 MW. The standalone generation leverages a diversion head of 200 meters and a design discharge of 11.8 m³/s, optimizing the available hydraulic potential for reliable energy production.
Contract:
Consulting services for Construction supervision of Rolwaling Khola Hydroelectric Project (Contract Identification No. RKHEP/CS/01-2079/80).
Consulting project’s highlights:
Project progress status till date
Status Ongoing
Tags: Construction Supervision