The contract agreement was signed with Vidyut Utpadan Company Limited (VUCL) with the objective of preparation of detail feasibility study report of Mugu Karnali Storage Hydroelectric Project.
Location : Mugu, Humla, Bajura, and Kalikot District, Karnali and Sudurpashchim Provinces
Type of Project : Storage
Design Discharge : 719.5 m3/s
Gross Head : 276m
Installed Capacity : 1902 MW
Annual Energy : 6291.8 GWh
Evaucation Substation : Regil Hub Substation (400 kV, 40 km)