Objective of the Projects:
To develop the hydropower projects from Jagdulla river in the peaking run of river type scheme in cascade of Jagdulla PROR Hydroelectric Project (106 MW) in the Dolpa district of Karnali Province and generate 738.5 MW electricity from the designed discharge of 30.6 m3/sec in Jagdulla River, a tributary of Bheri River.
Contract:
Consulting services for the Detailed Engineering Design and Preparation of Bidding Documents of Jagdulla A Hydroelectric Project.
Consulting project’s highlights
Status Ongoing
Tags: Detailed Engineering Design